Lesson objective
Identify and define terms and variables involved in scheduling transit service.
Identify impact of scheduling on transit system success.
Scheduling Goal and Variables
- Goal: least possible number of vehicles and operators to deliver the service design
- Key variable is platform time. Platform time is the total of these elements:
- Pull-out allowance (deadhead): Time taken to get the vehicle from the garage to the route start?
- Revenue trip: In-service time plus layovers
- Pull-in deadhead: How long from the end of the route to the garage?
- Blocking is determining vehicle schedules
- Runcutting is cutting the blocks into operator (driver) assignments.