Home | Contact us | Sign up

  About TFLEx    Agencies  

Bus and Rail Operations >
< Previous5 of 13Next >

Scheduling: Terms and Steps


Lesson objective

Identify and define terms and variables involved in scheduling transit service.

Identify impact of scheduling on transit system success.

Scheduling Goal and Variables

  • Goal: least possible number of vehicles and operators to deliver the service design
  • Key variable is platform time. Platform time is the total of these elements:
    • Pull-out allowance (deadhead): Time taken to get the vehicle from the garage to the route start?
    • Revenue trip: In-service time plus layovers
    • Pull-in deadhead: How long from the end of the route to the garage?
  • Blocking is determining vehicle schedules
  • Runcutting is cutting the blocks into operator (driver) assignments.
 
 
Next: Topic 1: Blocking
 Introduction
 Key Concepts
 Planning and Scheduling Overview
 Completing the Planning Process (after the Basic Five)
 Scheduling: Terms and Steps
 Topic 1: Blocking
 Topic 2: Runcutting
 Pay to Platform ratio
 Maintenance: Types and Costs
 Types of Maintenance
 Vehicle Maintenance Costs
 Sources
 Quiz


< Previous Next >
   about TFLEx | How to join | Contact us | Our mission | Privacy | Site Map | Glossary

Copyright © 1998-2010   Transit Finance Learning Exchange   All rights reserved (server @ www.web.com)